EV charging for government buildings and condominiums.

Korean-made 11 kW wall chargers, installed to Philippine electrical and structural standards, with sub-metering for clear energy billing.

  • 11 kW AC
  • IEC Type 2
  • 220 V single-phase
  • IP44
  • ~45 km range / hr

Built for the buildings where cars park all day, or all night.

AC charging fits places where vehicles stay parked for hours. It needs no special grid connection and costs far less to install than fast charging.

Government buildings

For agencies preparing for the EVIDA law and electrifying their fleets.

  • Supports compliance with RA 11697 (EVIDA) for EV-ready parking
  • Staff plug in at the start of the day and leave with a full charge
  • Fleet vehicles charge overnight and are ready each morning
  • Dedicated sub-metering for transparent energy audits

Condominiums

For developers, property managers and boards adding EV parking for residents.

  • Residents charge overnight in their own parking slot
  • Sub-metering per station so energy is billed to the right unit
  • Smart load management keeps the building supply within limits
  • Standard 2.5 × 5.0 m bays with bollards and wheel stops

MIDUM 2025

A Korean-made 11 kW wall charger.

MIDUM is a South Korean charger brand founded in 2017, with deployments at more than 250 locations. The 2025 model is tropicalized for Philippine heat, humidity and rain.

Full protection against surge, overcurrent, overvoltage, undervoltage and leakage current.

Charger specifications
Output11 kW, single-phase ACSuited to standard 220 V building feeds
Supply220 V AC, 60 HzPhilippine Electrical Code compliant
ConnectorIEC Type 2 (Mennekes)Per DOE Department Circular DC2023-05-0011
EnclosureIP44Weather and impact resistant
ConnectivityEthernet, OCPP-readyFor central monitoring and energy reporting
Charge time6–8 hours for most EVsAbout 45 km of range per hour

Lower running costs, charged during the hours cars are parked anyway.

~45 kmRange added per hour of charging
6–8 hFull charge for most EVs, one working day
11 kWNo fast-charger grid upgrade needed

Energy cost per kilometre (projection)

Gasoline car
₱7.50
Public fast charging
₱3.80
11 kW at your building
₱1.95

Projection based on Meralco commercial tariffs compared with current gasoline prices. Actual costs depend on tariffs, vehicle and driving.

Installed to Philippine standards.

Every site follows the Philippine Electrical Code and DPWH D.O. 136 structural standards.

Flood resilience

Chargers mounted 0.2 m above the highest recorded local flood level.

Standard bays

2.5 × 5.0 m parking bays with clear access paths.

Physical protection

Bollards and wheel stops protect each station from impact.

Sub-metering

A dedicated meter for each installation for transparent billing and audits.

From site audit to launch.

  1. Site audit

    We assess parking, electrical capacity and the best charger locations.

  2. Permits and grid clearance

    We handle permits and utility clearances for the installation.

  3. Installation

    Structural and electrical work, protection and sub-metering.

  4. DOE filing and launch

    Filing with the Department of Energy, testing and handover.

RA 11697

The Electric Vehicle Industry Development Act (EVIDA)

The law calls for the progressive integration of electric vehicles and dedicated charging stations, including in government facilities and buildings with parking. AC charging is the practical way for these buildings to get ready.

Talk to us about your building.

Tell us the location and number of parking slots, and we will arrange a site audit.

Office

Unit 3302, One Corporate Center
Meralco Ave., Ortigas Center
Pasig City, Metro Manila

Phone0968 880 9701
Emailadmin@tmaxasia.com